A professional can perform an audit to determine the exact amount of attic insulation that you need and determine whether you need to remove any of the previous insulation or material in your attic or if there are any leaks that need to be fixed.
Does san antonio require sprinkled attics.
The flow rate of a water supply measured at 20 pounds per square inch psi residual pressure that is available for fire fighting.
152 mm between the roof or floor deck and ceiling shall not require sprinkler protection.
The starting point to determining if attics require sprinkler protection is section 8 1 which basically says to protect all spaces unless there is a specific exemption somewhere in the standard.
If installed in an attic builders must provide access to the water heater large enough for it to be removed if it fails with at least 30 inches of headspace and 22 inches of width in the access path and have continuous solid flooring at least 24 inches wide.
One way in which the nfpa sprinkler committee has attempted recently to keep the water supply demand for the attic area reasonable is by allowing the use of small orifice k 4 2 sprinklers in.
An attic that is constructed of noncombustible construction including frt lumber products that provides limited access for inspection and maintenance purposes is not required to be protected with automatic sprinklers.
The 2006 edition of nfpa 5000 building construction and safety code included a first of its kind requirement in a u s.
8 15 1 2 4 concealed spaces formed by bar joists with less than 6 in.
8 15 1 2 5 concealed spaces formed by ceilings attached directly to or within 6 in.
Another 30 design area increase is required by nfpa 13 when the attic system is a dry pipe system often needed to accommodate freezing temperatures.
For years fire sprinkler provisions have been in building codes.
Building code for home fire sprinklers in one and two family dwellings subsequent editions of nfpa 5000 have retained this requirement.
If you live in the texas panhandle consider increasing your insulation level to at least r 38.
The required fire flow is the amount of water available at surrounding fire hydrants that the san antonio fire department requires in order to successfully fight a fire in a particular structure.
No permit required the following list of construction or remodeling projects typically do not require a permit.
Home fire sprinklers are a code requirement.
152 mm of wood joist or similar solid member construction shall not require sprinkler protection.
One story detached accessory structures used as tool and storage sheds playhouses and similar uses provided the floor area does not exceed 300 sq ft.
Talking to a professional contractor is a good idea even if you intend to make it a diy project.